Hunting management plan for the TECOR SAMPAIO, MARZÁN AND LOUSADELA (LU-10160), in the municipalities of Guntín and Monterroso (Lugo).
Authorship
D.L.E.
Bachelor's degree in Forest and Natural Environment Engeneering
D.L.E.
Bachelor's degree in Forest and Natural Environment Engeneering
Defense date
09.17.2025 10:45
09.17.2025 10:45
Summary
The project aims to organise hunting activities in the shared Hunting Ground (TECOR) ‘SAMPAIO, MARZÁN AND LOUSADELA’ for the seasons 2026/2027 to 2030/2031, with the aim of achieving sustainable and profitable use of its hunting resources. This TECOR has two quarters, the ‘Marzán’ quarter with 1,295.23 hectares and the ‘Lousadela’ quarter with 774 hectares, totalling 2,069.23 hectares. A comprehensive analysis of the legal, socio-economic, environmental and hunting situation of the TECOR was carried out. Inventories of the species hunted were made using the Finnish transect census method. The territory was stratified on the basis of the vegetation present and eight transects of between 5 and 8 km each were made in order to estimate the following densities: for roe deer (Capreolus capreolus), the average density is 5.1 ind/km2, which is optimal; for wild boar (Sus scrofa) it is 1.5 ind/km2, which is an average value in the province of Lugo; for foxes (Vulpes vulpes) it is slightly low (1.1 ind/km2); for the red-legged partridge (Alectoris rufa) it is 2.5 ind/km2, which is considered an average and good value for hunting; and for the rabbit (Oryctolagus cuniculus) the density is 0.9 ind/km2, which is a low value. The desirable populations for each species were determined by calculating the carrying capacity of the environment, based on technical literature and information provided by TECOR hunters. Based on actual and desirable densities, the following catch limits were established: for small game species, it was calculated that 23 individuals per year would be allowed for rabbits, 34 for red-legged partridges and 80 for wood pigeons; on the other hand, the corncrake and hare remain closed seasons; as for large game species, 45 individuals per year are established for roe deer; for wild boar, 7 in the first season, 20 in the second and third seasons, and 30 in subsequent seasons; finally, for foxes, hunting will be prohibited in the first season, 17 individuals are established in the second season, and 20 in subsequent seasons. The following improvement measures are planned: replacement of signage, planting, clearing, review of game preserves and repopulation for hunting. The budget for the five-year period is €12,614.21, which can be covered by the income from the annual membership fees.
The project aims to organise hunting activities in the shared Hunting Ground (TECOR) ‘SAMPAIO, MARZÁN AND LOUSADELA’ for the seasons 2026/2027 to 2030/2031, with the aim of achieving sustainable and profitable use of its hunting resources. This TECOR has two quarters, the ‘Marzán’ quarter with 1,295.23 hectares and the ‘Lousadela’ quarter with 774 hectares, totalling 2,069.23 hectares. A comprehensive analysis of the legal, socio-economic, environmental and hunting situation of the TECOR was carried out. Inventories of the species hunted were made using the Finnish transect census method. The territory was stratified on the basis of the vegetation present and eight transects of between 5 and 8 km each were made in order to estimate the following densities: for roe deer (Capreolus capreolus), the average density is 5.1 ind/km2, which is optimal; for wild boar (Sus scrofa) it is 1.5 ind/km2, which is an average value in the province of Lugo; for foxes (Vulpes vulpes) it is slightly low (1.1 ind/km2); for the red-legged partridge (Alectoris rufa) it is 2.5 ind/km2, which is considered an average and good value for hunting; and for the rabbit (Oryctolagus cuniculus) the density is 0.9 ind/km2, which is a low value. The desirable populations for each species were determined by calculating the carrying capacity of the environment, based on technical literature and information provided by TECOR hunters. Based on actual and desirable densities, the following catch limits were established: for small game species, it was calculated that 23 individuals per year would be allowed for rabbits, 34 for red-legged partridges and 80 for wood pigeons; on the other hand, the corncrake and hare remain closed seasons; as for large game species, 45 individuals per year are established for roe deer; for wild boar, 7 in the first season, 20 in the second and third seasons, and 30 in subsequent seasons; finally, for foxes, hunting will be prohibited in the first season, 17 individuals are established in the second season, and 20 in subsequent seasons. The following improvement measures are planned: replacement of signage, planting, clearing, review of game preserves and repopulation for hunting. The budget for the five-year period is €12,614.21, which can be covered by the income from the annual membership fees.
Direction
Riesco Muñoz, Guillermo (Tutorships)
Riesco Muñoz, Guillermo (Tutorships)
Court
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
PEREZ CRUZADO, CESAR (Secretary)
DIAZ PAZOS, JUAN ANGEL (Member)
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
PEREZ CRUZADO, CESAR (Secretary)
DIAZ PAZOS, JUAN ANGEL (Member)
Simplified forest management plan of Pivial forest (A Fonsagrada)
Authorship
P.M.M.
Bachelor's degree in Forest and Natural Environment Engeneering
P.M.M.
Bachelor's degree in Forest and Natural Environment Engeneering
Defense date
09.17.2025 09:15
09.17.2025 09:15
Summary
This simplified forest management plan is a Final Degree Project in Forestry and Natural Environment Engineering, aimed at meeting the needs of the Pivial forest, in the parish of A Bastida, belonging to the municipality of A Fonsagrada in the province of Lugo. The total study area is 4,23 hectares, encompassing a single cadastral plot but with different types of vegetation: eucalyptus, pasture, scrubland, and arable land. The purpose of this document is to provide the property owner with the possibility of making better use of the forest’s resources. This document is governed by the various regulations applicable to the autonomous community of Galicia and aims for the conservation and sustainable management of resources, guiding actions toward a balance between natural, economic, and social aspects.
This simplified forest management plan is a Final Degree Project in Forestry and Natural Environment Engineering, aimed at meeting the needs of the Pivial forest, in the parish of A Bastida, belonging to the municipality of A Fonsagrada in the province of Lugo. The total study area is 4,23 hectares, encompassing a single cadastral plot but with different types of vegetation: eucalyptus, pasture, scrubland, and arable land. The purpose of this document is to provide the property owner with the possibility of making better use of the forest’s resources. This document is governed by the various regulations applicable to the autonomous community of Galicia and aims for the conservation and sustainable management of resources, guiding actions toward a balance between natural, economic, and social aspects.
Direction
Rojo Alboreca, Alberto (Tutorships)
Rojo Alboreca, Alberto (Tutorships)
Court
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
DIEGUEZ ARANDA, ULISES (Secretary)
ALVAREZ GONZALEZ, JUAN GABRIEL (Member)
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
DIEGUEZ ARANDA, ULISES (Secretary)
ALVAREZ GONZALEZ, JUAN GABRIEL (Member)
Forest management plan for Monte Maior, San Roque and Penedo do Galo communal forest, measuring 400,84 ha, in Santa María and Santiago parishes in Viveiro, Lugo.
Authorship
D.M.P.
Bachelor's degree in Forest and Natural Environment Engeneering
D.M.P.
Bachelor's degree in Forest and Natural Environment Engeneering
Defense date
09.17.2025 10:00
09.17.2025 10:00
Summary
This Final Degree Project focuses on the preparation and drafting of the management plan for the communal forest (Monte Maior, San Roque e Penedo do Galo), owned by the residents of the parishes of Santa María and Santiago de Viveiro, in the province of Lugo. The forest covers 400.84 ha, divided into two plots. The project was motivated by the need to update the forest management, since it is a communal forest of over 25 hectares in a single block, and the last management plan dates to 2004. The plan aims to enhance the social and environmental sustainability of the forest, while maintaining its economic and productive viability. In developing this updated plan, previous studies were considered, especially the last management plan requested by the community in September 2004. The current legal framework and the community’s needs as of January 2025 were also taken into account, with the goal of proposing a forest management plan aligned with these criteria and regulations.
This Final Degree Project focuses on the preparation and drafting of the management plan for the communal forest (Monte Maior, San Roque e Penedo do Galo), owned by the residents of the parishes of Santa María and Santiago de Viveiro, in the province of Lugo. The forest covers 400.84 ha, divided into two plots. The project was motivated by the need to update the forest management, since it is a communal forest of over 25 hectares in a single block, and the last management plan dates to 2004. The plan aims to enhance the social and environmental sustainability of the forest, while maintaining its economic and productive viability. In developing this updated plan, previous studies were considered, especially the last management plan requested by the community in September 2004. The current legal framework and the community’s needs as of January 2025 were also taken into account, with the goal of proposing a forest management plan aligned with these criteria and regulations.
Direction
CARRAL VILARIÑO, EMILIO V. (Tutorships)
Rojo Alboreca, Alberto (Co-tutorships)
CARRAL VILARIÑO, EMILIO V. (Tutorships)
Rojo Alboreca, Alberto (Co-tutorships)
Court
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
DIEGUEZ ARANDA, ULISES (Secretary)
ALVAREZ GONZALEZ, JUAN GABRIEL (Member)
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
DIEGUEZ ARANDA, ULISES (Secretary)
ALVAREZ GONZALEZ, JUAN GABRIEL (Member)
Technical study for the anaysis of alternatives for the use of the forest of the parish of Camariñas.
Authorship
A.M.P.L.
Double bachelor degree in Agricultural and Agrofood Engeneering and Forest and Natural Environment Engeneering
A.M.P.L.
Double bachelor degree in Agricultural and Agrofood Engeneering and Forest and Natural Environment Engeneering
Defense date
09.17.2025 12:00
09.17.2025 12:00
Summary
This study aims to assess the suitability of the different proposed forest uses at the parish scale, integrating complex territorial data (biophysical, regulatory, and social) into a multicriteria model in QGIS. The methodology is structured around field inventories, validation with local knowledge, and the reclassification of comparative criteria on a 0 5 scale, complemented by regulatory and environmental restrictions (buffer strips, riparian protection zones, and the eucalyptus moratorium). The outcome consists of three cartographic products for each use: raw suitability, final suitability, and average suitability per plot, which allow for a direct interpretation of the viability of the proposed uses. This assessment encompasses timber production (conifers and broadleaves), silvopastoral systems, beekeeping, mycology, resin tapping, and hop cultivation, thus diversifying forest management, enhancing its potential, and preventing land abandonment. The study incorporates criteria of green infrastructure, buffer zones, and ecological corridors, taking into account proximity to habitats and their compatibility with current land uses. In this way, it defines a multifunctional agroforestry mosaic that strengthens resilience to wildfires, integrates the ecological dimension with productive uses, and seeks to foster the interest of younger generations. At the organizational level, the study proposes a governance model based on the Joint Management Association, which brings together landowners, public administrations, and social stakeholders, coordinating actions within a common framework. As a follow-up, it foresees the development of a 10-year Joint Management Plan, supported by a green infrastructure strategy for the parish and by training and monitoring programs, with the aim of consolidating a forest management approach that is structured, sustainable, participatory, and replicable in other parishes.
This study aims to assess the suitability of the different proposed forest uses at the parish scale, integrating complex territorial data (biophysical, regulatory, and social) into a multicriteria model in QGIS. The methodology is structured around field inventories, validation with local knowledge, and the reclassification of comparative criteria on a 0 5 scale, complemented by regulatory and environmental restrictions (buffer strips, riparian protection zones, and the eucalyptus moratorium). The outcome consists of three cartographic products for each use: raw suitability, final suitability, and average suitability per plot, which allow for a direct interpretation of the viability of the proposed uses. This assessment encompasses timber production (conifers and broadleaves), silvopastoral systems, beekeeping, mycology, resin tapping, and hop cultivation, thus diversifying forest management, enhancing its potential, and preventing land abandonment. The study incorporates criteria of green infrastructure, buffer zones, and ecological corridors, taking into account proximity to habitats and their compatibility with current land uses. In this way, it defines a multifunctional agroforestry mosaic that strengthens resilience to wildfires, integrates the ecological dimension with productive uses, and seeks to foster the interest of younger generations. At the organizational level, the study proposes a governance model based on the Joint Management Association, which brings together landowners, public administrations, and social stakeholders, coordinating actions within a common framework. As a follow-up, it foresees the development of a 10-year Joint Management Plan, supported by a green infrastructure strategy for the parish and by training and monitoring programs, with the aim of consolidating a forest management approach that is structured, sustainable, participatory, and replicable in other parishes.
Direction
DIAZ VARELA, EMILIO RAFAEL (Tutorships)
DIAZ VARELA, EMILIO RAFAEL (Tutorships)
Court
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
MIRANDA BARROS, DAVID (Secretary)
MAREY PEREZ, MANUEL FRANCISCO (Member)
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
MIRANDA BARROS, DAVID (Secretary)
MAREY PEREZ, MANUEL FRANCISCO (Member)
Expansion of the Industrial Zone of the Gándaras near the sector IN-F in Lugo (Northeast)
Authorship
D.R.A.
Bachelor's degree in Civil Engeneering
D.R.A.
Bachelor's degree in Civil Engeneering
Defense date
09.18.2025 10:00
09.18.2025 10:00
Summary
This project proposes a new vision of the planning, parcelling and urbanism, already proposed and approved, but not fully executed, in the Industrial Sectorial Plan for the As Gándaras Business Park (municipality of Lugo). All of the information related to the new proposal is presented, including the area plans, referred to as UZPI-1.I. The aforementioned project consists of a total of 9 stages of urbanization, affecting a total area of 2.1 million square metres, half of which will be allocated to accommodate 268 plots for industrial use. The working area covered by the project has a floor area of 711,585.47 m2, or approximately 71.16 hectares. The coordinates of the geometric centre of the working area are 43º 02' 28’’N and 7º 31' 10’’W. The project includes an Excel spreadsheet, in which the maximum relative buildability is broken down into sub-areas, detailing the maximum occupation, maximum buildability and the maximum number of floors proposed for the area. The project also includes a proposal for service networks (gas, water, electricity, telecommunications, etc.) supported by the existing services in the already executed area, as indicated in the project title, as it involves the expansion and not the creation of new infrastructures. Finally, the graphical Plans outlining the projected work are presented, along with the project execution Budget, including the total cost of the work, which amounts to 24.409.993,72 €.
This project proposes a new vision of the planning, parcelling and urbanism, already proposed and approved, but not fully executed, in the Industrial Sectorial Plan for the As Gándaras Business Park (municipality of Lugo). All of the information related to the new proposal is presented, including the area plans, referred to as UZPI-1.I. The aforementioned project consists of a total of 9 stages of urbanization, affecting a total area of 2.1 million square metres, half of which will be allocated to accommodate 268 plots for industrial use. The working area covered by the project has a floor area of 711,585.47 m2, or approximately 71.16 hectares. The coordinates of the geometric centre of the working area are 43º 02' 28’’N and 7º 31' 10’’W. The project includes an Excel spreadsheet, in which the maximum relative buildability is broken down into sub-areas, detailing the maximum occupation, maximum buildability and the maximum number of floors proposed for the area. The project also includes a proposal for service networks (gas, water, electricity, telecommunications, etc.) supported by the existing services in the already executed area, as indicated in the project title, as it involves the expansion and not the creation of new infrastructures. Finally, the graphical Plans outlining the projected work are presented, along with the project execution Budget, including the total cost of the work, which amounts to 24.409.993,72 €.
Direction
IGLESIAS RODRIGUEZ, MARIO (Tutorships)
FUENTES FAILDE, PABLO (Co-tutorships)
IGLESIAS RODRIGUEZ, MARIO (Tutorships)
FUENTES FAILDE, PABLO (Co-tutorships)
Court
LOPEZ MOREIRA, IVAN (Coordinator)
LOPEZ MOREIRA, IVAN (Chairman)
NUÑEZ TEMES, CARLOS (Secretary)
CASTRO PONTE, ALBERTE (Member)
LOPEZ MOREIRA, IVAN (Coordinator)
LOPEZ MOREIRA, IVAN (Chairman)
NUÑEZ TEMES, CARLOS (Secretary)
CASTRO PONTE, ALBERTE (Member)
Plan for the improvement of the Boicalvo fishery reserve in Lengüelle river (A Coruña)
Authorship
A.R.L.
Bachelor's degree in Forest and Natural Environment Engeneering
A.R.L.
Bachelor's degree in Forest and Natural Environment Engeneering
Defense date
09.17.2025 13:15
09.17.2025 13:15
Summary
The purpose of this project is the planning and drafting of the Plan for the Improvement and the Management of the Boicalvo fishery reserve in the medium-high stretch of the Lengüelle river. The beat is 8.8 km long, with a catchment area of about 61.86 km2 and an average slope of the catchment area of 12.28%. A study of the physical environment, a physico-chemical and biological analysis of the water was carried out at to determine the state of the beat and to find out which characteristics need to be changed or improved. Obstacles as well as refuges were observed along the river. All of these were assessed and inventoried in this Plan. The present project also consists on a fish inventory where the conditions of the fish populations, in this case made up exclusively of trout, were studied. The objectives of the promoter, in this case the Consellería de Medio Ambiente y Cambio Climático, and the interested parties, the Sociedad de Pesca y Conservación del Lengüelle, are to regulate the exploitation of trout for a sustainable management of the resources and to apply improvements that favour both fish and anglers. The Management Plan will last 3 years, during which time it is decided to do catch and release fishing in the first two years. After an analysis of the populations and the conditions of the river to check whether the measures and objectives are being met, in the last year is planned to do normal fishing.
The purpose of this project is the planning and drafting of the Plan for the Improvement and the Management of the Boicalvo fishery reserve in the medium-high stretch of the Lengüelle river. The beat is 8.8 km long, with a catchment area of about 61.86 km2 and an average slope of the catchment area of 12.28%. A study of the physical environment, a physico-chemical and biological analysis of the water was carried out at to determine the state of the beat and to find out which characteristics need to be changed or improved. Obstacles as well as refuges were observed along the river. All of these were assessed and inventoried in this Plan. The present project also consists on a fish inventory where the conditions of the fish populations, in this case made up exclusively of trout, were studied. The objectives of the promoter, in this case the Consellería de Medio Ambiente y Cambio Climático, and the interested parties, the Sociedad de Pesca y Conservación del Lengüelle, are to regulate the exploitation of trout for a sustainable management of the resources and to apply improvements that favour both fish and anglers. The Management Plan will last 3 years, during which time it is decided to do catch and release fishing in the first two years. After an analysis of the populations and the conditions of the river to check whether the measures and objectives are being met, in the last year is planned to do normal fishing.
Direction
Riesco Muñoz, Guillermo (Tutorships)
Riesco Muñoz, Guillermo (Tutorships)
Court
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
DIAZ PAZOS, JUAN ANGEL (Secretary)
PEREZ CRUZADO, CESAR (Member)
RUIZ GONZALEZ, ANA DARIA (Coordinator)
RUIZ GONZALEZ, ANA DARIA (Chairman)
DIAZ PAZOS, JUAN ANGEL (Secretary)
PEREZ CRUZADO, CESAR (Member)